Back to All Playbooks
Manufacturing & Industrial

Holding Industrial Machinery Manufacturers Accountable for Premature Failure

OEM machinery manufacturers blame operator error to avoid paying $100k warranty repairs. Discover how to present immutable SCADA telemetry to prove OEM defect.

Amit Kasliwal
Amit KasliwalCEO & Founder, Dehurdle
January 25, 20244 min read
Holding Industrial Machinery Manufacturers Accountable for Premature Failure

The SCADA Telemetry Warranty Claim Script

Recommended Spoken Script
"Our verified SCADA telemetry logs demonstrate that hydraulic operating pressure and oil viscosity remained 100% within OEM factory specifications throughout the 600 operating hours. The catastrophic cylinder blowout was caused by casting porosity in the cylinder wall. We expect full warranty replacement and expedited air dispatch within 48 hours."

The 2-Minute Practice Drill

2-Minute Spoken Drill

The 2-Minute Practice Drill

Practice OEM warranty dispute negotiations in Dehurdle.

Recommended Playbooks