Negotiating Fast-Charging Substation Power Allocations with Utilities
Deploying 350kW DC fast charging stations requires negotiating 5MW substation power capacity with hesitant electric utility companies. Here is the peak-shaving battery pitch.
Amit KasliwalCEO & Founder, Dehurdle
October 04, 20224 min read

The Battery-Buffered Grid Interconnect Pitch
Recommended Spoken Script
"To eliminate grid strain during local peak hours, our 8-dispenser fast charging plaza incorporates a 2MWh onsite battery energy storage system. The station charges from the grid during off-peak night hours and deploys stored energy during peak daytime charging surges, limiting maximum grid pull to a stable 800kW draw."
The 2-Minute Practice Drill
2-Minute Spoken Drill
The 2-Minute Practice Drill
Practice utility interconnect negotiations in Dehurdle.
Follow Dehurdle on Google
Add Dehurdle to your Google Preferred Sources to see our playbooks in your AI Overviews and Google Search.