Negotiating Fast-Charging Substation Power Allocations with Utilities
Deploying 350kW DC fast charging stations requires negotiating 5MW substation power capacity with hesitant electric utility companies. Here is the peak-shaving battery pitch.
Amit KasliwalCEO & Founder, Dehurdle
October 04, 20224 min read

The Battery-Buffered Grid Interconnect Pitch
Recommended Spoken Script
"To eliminate grid strain during local peak hours, our 8-dispenser fast charging plaza incorporates a 2MWh onsite battery energy storage system. The station charges from the grid during off-peak night hours and deploys stored energy during peak daytime charging surges, limiting maximum grid pull to a stable 800kW draw."
The 2-Minute Practice Drill
2-Minute Spoken Drill