Back to All Playbooks
Automotive & EV Supply Chains

Negotiating Fast-Charging Substation Power Allocations with Utilities

Deploying 350kW DC fast charging stations requires negotiating 5MW substation power capacity with hesitant electric utility companies. Here is the peak-shaving battery pitch.

Amit Kasliwal
Amit KasliwalCEO & Founder, Dehurdle
October 04, 20224 min read
Negotiating Fast-Charging Substation Power Allocations with Utilities

The Battery-Buffered Grid Interconnect Pitch

Recommended Spoken Script
"To eliminate grid strain during local peak hours, our 8-dispenser fast charging plaza incorporates a 2MWh onsite battery energy storage system. The station charges from the grid during off-peak night hours and deploys stored energy during peak daytime charging surges, limiting maximum grid pull to a stable 800kW draw."

The 2-Minute Practice Drill

2-Minute Spoken Drill

The 2-Minute Practice Drill

Practice utility interconnect negotiations in Dehurdle.

Recommended Playbooks