Automotive & EV Supply Chains

Negotiating Fast-Charging Substation Power Allocations with Utilities

Deploying 350kW DC fast charging stations requires negotiating 5MW substation power capacity with hesitant electric utility companies. Here is the peak-shaving battery pitch.

Amit Kasliwal
Amit KasliwalCEO & Founder, Dehurdle
October 04, 20224 min read
Negotiating Fast-Charging Substation Power Allocations with Utilities

The Battery-Buffered Grid Interconnect Pitch

Recommended Spoken Script
"To eliminate grid strain during local peak hours, our 8-dispenser fast charging plaza incorporates a 2MWh onsite battery energy storage system. The station charges from the grid during off-peak night hours and deploys stored energy during peak daytime charging surges, limiting maximum grid pull to a stable 800kW draw."

The 2-Minute Practice Drill

2-Minute Spoken Drill

The 2-Minute Practice Drill

Practice utility interconnect negotiations in Dehurdle.

Follow Dehurdle on Google

Add Dehurdle to your Google Preferred Sources to see our playbooks in your AI Overviews and Google Search.

Recommended Playbooks