When a backhoe cuts a 288-strand backbone fiber line taking 200,000 customers offline, network operations directors must lead real-time emergency restoration briefings.

Vishal Verma
Vishal VermaCTO & Co-Founder, Dehurdle
August 29, 20224 min read
Leading Real-Time Emergency Splicing Briefings After Major Highway Fiber Cuts

The Fiber Restoration Command Script

Recommended Spoken Script
"At 10:14 AM, third-party excavation severed our primary backbone cable on Interstate 95. Automated optical protection switches rerouted 80% of data traffic across our secondary western ring within 45 milliseconds. Three fusion-splicing teams are on site with OTDR meters, with complete circuit restoration estimated by 14:30."

The 2-Minute Practice Drill

2-Minute Spoken Drill

The 2-Minute Practice Drill